Design note
Rollout plan, v1
A working document, kept as written. It is not the specification: where it and the spec disagree, the spec wins.
Rollout plan, v1
Date: 2026-03-11
Status: historical. Delivered in part; the command names below are not the ones that shipped.
Kept because it records what was planned, not what exists. For the commands that
exist, run cassini help.
Phase 1: Read support
- add
cassini inspect meeting.opus - add Cassini metadata detection for
.opus - add integrity verification and plain-audio fallback
Phase 2: Export support
- add
cassini pack <meeting bundle> --out meeting.opus - emit the v1 tags and embedded manifest
Phase 3: Native record flow
- add
cassini record --out meeting.opus - add
cassini record --into ./Archive
Phase 4: Archive UX
- add
cassini browse ./Archive - add
cassini add file.opus ./Archive - add
cassini share file.opus --out ./shared
This page is rendered from design/rollout-plan-v1.md in
the specification repository. If the two ever disagree, the file wins.